Practice · graded on a filing
Single-stage DCF practice
Build a single-stage DCF from a real company’s latest annual filing. You are given the filed figures, each cited to the filing it came from. You derive the rest, and every line is checked by code against that filing. No account needed.
Pick a company
The model is the same for each one. The figures are that company’s own, so the answer is too.
What the drill asks
Compound a base unlevered free-cash-flow figure at a stated growth rate, discount each year at a stated discount rate, take a Gordon terminal value, and sum to an implied enterprise value. Every cell is arithmetic; the model stops at enterprise value and never reaches a per-share number.
Given · Operating cash flow, interest expense, the effective tax rate and capital expenditures, as filed in the latest annual report, bridged to unlevered free cash flow (CFO + after-tax interest − CapEx).
Convention: unlevered FCF = CFO + interest × (1 − t) − CapEx. Where the filing's tags ground it, EBIT × (1 − t) + D&A − CapEx − ΔNWC is graded correct too.
“Walk me through a DCF.”
Project the company's unlevered free cash flow for a few years, discount each year back at the weighted average cost of capital, add a terminal value for everything after the projection, discounted the same way, and the sum is enterprise value. Unlevered, because the cash flow belongs to debt and equity holders together, which is why the rate is the WACC.
- Why it works
- A dollar in year three counts for less today because you could have invested it in the meantime. Discounting at the WACC asks what the cash flows mean today to everyone who funded the business. Most of the value usually sits in the terminal value, which is why the growth and discount assumptions matter so much.
- The common trap
- Discounting the terminal value for one year fewer or one more than the final projection year. The terminal value sits at the end of year N, so it takes N years of discounting, the same as the last year's cash flow.
The full mechanics · 6 steps
- 01Start from unlevered free cash flow: cash from operations, plus after-tax interest, less capital expenditure.
- 02Grow it at the stated rate for each projection year.
- 03Discount year t by (1 + discount rate) to the power t.
- 04Terminal value = final-year cash flow × (1 + terminal growth) ÷ (discount rate − terminal growth).
- 05Discount the terminal value by the same N years as the final cash flow.
- 06Enterprise value is the sum of the discounted cash flows and the discounted terminal value.
Comes up inIB first-round technicalsIB superdayModeling testEquity research case
Other models
Terms this model is built from
Educational use only — not investment advice. Figures come from public SEC filings; Echelon teaches you to analyze data, it never recommends buying or selling any security.